Railway Transport Tenders | Maharashtra E Tenders

Total 943 tenders found

Live

#RefNo:34632002 Maharashtra - Pune

Railway Transport

Repair And Maintenance Of 110 Kv 3-phase Transmission Lines And Transmission Towers Se-i & Se-ii Feeders Between Lonavala-khadki Section Of Pune Division Of Central Railway For A Period Of 02 Years

Live

#RefNo:34626940 Maharashtra - Daund

Railway Transport

Supply Of Waterless Urinal.

Live

#RefNo:34629474 Maharashtra - Nagpur

Railway Transport

Provision Of Ramp, Non Slippery Accessible Route, Drinking Water Booth, Low Height Ticket Counter, Ramp At Entrance Of Passenger Halt Station Building And Drinking Water Arrangement At Passenger Halt And Pathway For Inter Platform Transfer At The Ends Of Platform Under The Jurisdiction Of Aden/Nagbhir.

Live

#RefNo:34626660 Maharashtra - Bhusawal

Railway Transport

Supply Of Brake Head To Rdso Drg. No. Wd-08093-s-02, Alt. 3, Item No. 7, Material And Specification Confirming To Rdso Specification No. Wd-23-bmbs-2008 Rev. 1 With Amendment No.1 Of Sept 2016..

Live

#RefNo:34626701 Maharashtra - Bhusawal

Railway Transport

Supply Of Washer For Centre Pivot Rubber Bonded To Rdso Drg. No. Wd-85079-s-2, Alt.-27, Item No. 4. Material And Specification As Per Drawing.

Live

#RefNo:34629440 Maharashtra - Solapur

Railway Transport

Miscelleneous P.Way Work Under Sse/P.Way/Lur Under Aden/Lur Sub-Division For A Period Of Two Years.

Live

#RefNo:34629567 Maharashtra - Solapur

Railway Transport

Daund - Wadi -Tftr - 3.00 Km By Cut & Connection Method Under Adent/Sur In Solapur Division.

Live

#RefNo:34632512 Maharashtra - Ratnagiri

Railway Transport

Comprehensive Annual Maintenance Contract For Escalator At Ratnagiri Railway Station Under Ratnagiri Region Of Konkan Railway For A Period Of Three Years.

Live

#RefNo:34632228 Maharashtra - Nanded

Railway Transport

Scr Construction Organization - Engineering, Procurement And Construction Epc - Contract For Construction Of New Bi-directional Twin Tunnels On Diversion 1 Main Tunnel Of 6.70 Km Long Each 6.05 Km Main Tunnel Length + 0.65 Km Main Cut & Cover Length And 1.8 Km Approach Length For Main Tunnel 2 Evacuation Tunnel Of 6.70 Km Long Each 6.05 Km Evacuation Tunnel Length + 0.65 Km Evacuation Cut & Cover Length And 1.8 Km Approach Length For Evacuation Tunnel, Total 8.5 Kms Length Including Approaches On Blt And Other Allied Works Between Usarani-jamod Stations From Km: 669.000 To Km: 677.500 Of Akot - Amlakhurd Section In Connection With Akola-khandwa Gauge Conversion Project In Nanded Division Of South Central Railway

Live

#RefNo:34631769 Maharashtra - Mumbai

Railway Transport

Renovation Of East And West Wing Of 6th Floor, Belapur Bhavan, Cbd Belapur, Navi Mumbai Computer No.61631 Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable

Live

#RefNo:34632534 Maharashtra - Mumbai

Railway Transport

Design, Supply, Erection, Testing & Commissioning Of Overhead Equipment Modification /Infringement Removal Of Ohe Connection With Construction Of Fobs At Different Location Under Ph-53 Phase Ii Over Mumbai Division Central Railway.

Live

#RefNo:34630288 Maharashtra - Nanded

Railway Transport

1Nanded Division - Provision Of Limited Height Subway In Lieu Of Lc 41 Between Poz-Dlb Stations.-Trd Arrangement, 2 Nanded Division - Provision Of Limited Height Subway In Lieu Of Lc No-42 Between Poz-Dlb Stations.-Trd Arrangement.

Location

Agency