Maharashtra E Tenders
Search latest Indian tenders from largest e-Tenders database from India on Tender Detail. We cover all Indian tenders publishes by state / central government, semi government, PSUs, Trust, NGO, Association, Universities, Corporate and Private companies on daily basis from 35 states of India. We cover both offline and online tenders published in national / regional newspaper, tendering authority’s websites and state / central government e-tendering / e-procurement portals.
Total 7338 tenders found
#RefNo:34638785 Maharashtra - Palghar
Scientific Research/instruments
Gem Bids For 1 Pc Based Ion Chromatograph System And Respective Required Spares As Described In Annexure
#RefNo:34648571 Maharashtra - Mumbai
Railway Transport
Supply Of Improved High Tight Lock Center Buffer.
#RefNo:33660026 Maharashtra - Mumbai
Railway Transport
Supply of Hydraulic Insulator Testing Jig For Tensile Load Testing Of 25Kv Porcelain And Composite In Sulator As Per Rdso Spec. No. Ti/Spc/Ohe/Instest/0090/02/2009 Rev O Or Latest. Warranty Perio D: 30 Months After The Date Of Delivery
#RefNo:34648998 Maharashtra - Mumbai
Railway Transport
Supply, Installation, Testing & Commissioning Of Vacuum Drying Plant.
#RefNo:33605836 Maharashtra - Nasikcity
Air Transport
Ostool-Manufacture And Supply Of Bubble Stands Stand For Vertical Fin, Package Set Of 03 Lines, Htt Ge 24 13 1.
#RefNo:34649484 Maharashtra - Mumbai
Railway Transport
Supply Of Gear Case Assembly..
#RefNo:33590145 Maharashtra - Mumbai
Railway Transport
Supply of Thermal Insulation For Under Frame Of Railway Coach, Size: 25 X 935 X 1000M M Conforming To Rcf Specn Mdts-28001, Rev-03 Andto Drg.No.Lwsczac-9-0-004, Alt-C, Col- 1, Item-4 Only.In Specification Mdts - 28001, Rev.03, Where Ever Cde/Rcf Appears It Should Beread As Cde/Icf. Warranty Period: 30 Months After The Date Of Delivery
#RefNo:34594842 Maharashtra - Mumbai
Railway Transport
Design, Supply, Erection, Testing & Commissioning Of 220/132/55 Kv Traction Substation, Sectioning Post Sps And Sub Sectioning Post Ssps In 2 X 25 Kv Traction System Scott Connected Transformer Of Daund - Solapur Sections Of Central Railway, To Meet 3000 Mt Loading Target On Epc Mode.
#RefNo:34351696 Maharashtra - Bhiwandi
Services
Gem Bids For Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Admin Cleaning Sanitation And Disinfection Service - Outcome Based - Officecommercialinstitutionsresidential; General Cleaning Sweeping Mopping Dusting; Indoor
#RefNo:34632228 Maharashtra - Nanded
Railway Transport
Scr Construction Organization - Engineering, Procurement And Construction Epc - Contract For Construction Of New Bi-directional Twin Tunnels On Diversion 1 Main Tunnel Of 6.70 Km Long Each 6.05 Km Main Tunnel Length + 0.65 Km Main Cut & Cover Length And 1.8 Km Approach Length For Main Tunnel 2 Evacuation Tunnel Of 6.70 Km Long Each 6.05 Km Evacuation Tunnel Length + 0.65 Km Evacuation Cut & Cover Length And 1.8 Km Approach Length For Evacuation Tunnel, Total 8.5 Kms Length Including Approaches On Blt And Other Allied Works Between Usarani-jamod Stations From Km: 669.000 To Km: 677.500 Of Akot - Amlakhurd Section In Connection With Akola-khandwa Gauge Conversion Project In Nanded Division Of South Central Railway
#RefNo:34648678 Maharashtra - Mumbai
Railway Transport
Supply Of A Set Consist Of 1 Brake Caliper.
#RefNo:33663098 Maharashtra - Mumbai
Railway Transport
Supply of Internal Micrometer 3-Point Metric, Series: 468 Digimatic Holtests, 175 To 200Mm Measuring +/-5Um Accuracy, 0.001 Mm Resolution, Lcd Display, Sr44 Battery Power Source Similar Equivalent To Mit Utoyo 468-177 Along With Calibration Certificates Of Nabl Approved Lab Or Npl Make-Mitutoyo Or Equivalent With Customized Ring Of Size 180Mm For Calibration Purpose, Make -Mitutoyo/Tesa/Forbes Only. Warra Nty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs